Vandellós Nuclear Power Plant Control Room
Client: ANAV
Year: 2003
Description: Project for the extension of the control room, from the 6mm enclosure to the installation of the consoles and cabinets.
EJ Project Vandellos Nuclear Power Plant
Client: ANAV
Year: 2003
Re-qualification class 1E trolley, Ascó Nuclear Power Station
Client: ANAV
Year: 2016
Description: From the existing trolleys we carry out the tasks of dismantling, zinc plating and subsequent assembly of new components with the corresponding wiring. Finally, we carry out a very rigorous quality control with a series of tests to verify more than 600 CCMs.
Desalination plant Agadir (Morocco)
Client: Tecnicas Reunidas
Year: 2018
Description: Project for the control of a water desalination plant on the north coast of Morocco, with more than 100 panels.
Telecontrol Project Red Eléctrica Uruguay
Client: UTE
Year: 2023
Description: Project consisting of more than 300 units of cabinets distributed throughout the country, which will remotely control Uruguay’s electricity grid.
Electrical Substation Cabinets
Client: Endesa
Year: desde 2000 – actualidad
Location: Spain
Description: Once the cabinet has been prototyped in our facilities, we have been making cabinets for the management of electrical substations for more than 25 years.
IQOXE plant recovery
Client: IQOXE
Year: 2020
Description: Following the accident that occurred in 2020, Emasa acted on the electrical and management recovery of the chemical plant immediately.
Re-qualification BASF Trolleys
Client: BASF
Year: 2022
Location: BASF Chemical, Tarragona
Description: Work in the CCMs of the chemical industry, carrying out rewiring, programming and FAT tests.
Manufacture of Class 1E components
Client: ANAV Central Nuclear
Year: 2019
Description: Manufacture of the following Class 1E nuclear safety components (equipment having a direct bearing on the nuclear reactor).